<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>parking spaces | CREST Engineering Associates Inc.</title>
	<atom:link href="https://crestengineering.net/tag/parking-spaces/feed/" rel="self" type="application/rss+xml" />
	<link>https://crestengineering.net</link>
	<description>The Best with CREST</description>
	<lastBuildDate>Thu, 16 Apr 2020 02:13:52 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1.4</generator>

<image>
	<url>https://crestengineering.net/wp-content/uploads/2018/05/cropped-crest_logo_icon-32x32.jpg</url>
	<title>parking spaces | CREST Engineering Associates Inc.</title>
	<link>https://crestengineering.net</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>December 2019 Updates</title>
		<link>https://crestengineering.net/planner/december-2019-updates/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Sat, 28 Dec 2019 10:00:00 +0000</pubDate>
				<category><![CDATA[engineer]]></category>
		<category><![CDATA[land surveyors]]></category>
		<category><![CDATA[landscape architect]]></category>
		<category><![CDATA[planner]]></category>
		<category><![CDATA[civil engineers]]></category>
		<category><![CDATA[environmental engineers]]></category>
		<category><![CDATA[parking lots]]></category>
		<category><![CDATA[parking spaces]]></category>
		<category><![CDATA[site plan]]></category>
		<guid isPermaLink="false">https://crestengineering.net/backup/?p=749</guid>

					<description><![CDATA[CREST Monthly Updates Planning Robbinsville, NJ &#8211; December 2019, Approval Project: 12,000 SF Office/Warehouse &#38; Associated Parkingl Monroe Twp, NJ &#8211; December 2019, Monroe Place Apartments construction Completed Adding More Parking Spaces &#8211; Remember a Minor Site Plan may be Required Even adding more than three parking spaces to a parking lot may require a minor site plan. According to the NJ State Planning 1997 Municipal Land Use Law, a &#8220;Site plan&#8221; means a development plan of one or more lots on which is shown (1) the existing and proposed conditions of the lot, including but not necessarily limited to topography, vegetation, drainage, flood plains,marshes and waterways, (2) the location of all existing and proposed buildings, drives, parking spaces,walkways, means of ingress and egress, drainage facilities, utility services, landscaping, structures and signs,lighting, screening devices, and (3) any other information that may be reasonably required in order to make an informed determination pursuant to an ordinance requiring review and approval of site plans by the planning board adopted pursuant to article 6 of this act. Contact Crest Engineering if you are expanding your parking lot to ensure that your project is compliant with all laws and regulations. Get the BEST with [&#8230;]]]></description>
										<content:encoded><![CDATA[
<div class="wp-block-columns is-layout-flex wp-container-core-columns-is-layout-8f761849 wp-block-columns-is-layout-flex">
<div class="wp-block-column is-layout-flow wp-block-column-is-layout-flow" style="flex-basis:33.33%">
<h2 class="wp-block-heading">CREST Monthly Updates</h2>



<h3 class="wp-block-heading">Planning</h3>



<p class="wp-block-paragraph">Robbinsville, NJ &#8211; December 2019, Approval<br> Project: 12,000 SF Office/Warehouse &amp; Associated Parkingl </p>



<p class="wp-block-paragraph">Monroe Twp, NJ &#8211; December 2019,<strong> Monroe Place Apartments </strong>construction Completed</p>



<p class="wp-block-paragraph"></p>
</div>



<div class="wp-block-column is-layout-flow wp-block-column-is-layout-flow" style="flex-basis:66.66%">
<h2 class="wp-block-heading">Adding More Parking Spaces &#8211; Remember a Minor Site Plan may be Required</h2>



<p class="wp-block-paragraph"> Even adding more than three parking spaces to a parking lot may require a minor site plan.<br><br>
According to the NJ State Planning 1997 Municipal Land Use Law, a &#8220;Site plan&#8221; means a development plan of one or more lots on which is shown (1) the existing and proposed conditions of the lot, including but not necessarily limited to topography, vegetation, drainage, flood plains,marshes and waterways, (2) the location of all existing and proposed buildings, drives, parking spaces,walkways, means of ingress and egress, drainage facilities, utility services, landscaping, structures and signs,lighting, screening devices, and (3) any other information that may be reasonably required in order to make an informed determination pursuant to an ordinance requiring review and approval of site plans by the planning board adopted pursuant to article 6 of this act.<br><br>
Contact Crest Engineering if you are expanding your parking lot to ensure that your project is compliant with all laws and regulations.  Get the BEST with CREST.  
</p>
</div>
</div>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
